WEBVTT

1
00:00:00.000 --> 00:00:04.725
This is Analyst Dojo: lessons for the CFA Level One exam.

2
00:00:05.236 --> 00:00:12.562
Today: Effective duration and effective convexity, from Fixed Income · Curve-Based

3
00:00:12.736 --> 00:00:15.279
and Empirical Fixed-Income Risk Measures.

4
00:00:16.179 --> 00:00:19.534
Effective duration and effective convexity.

5
00:00:20.649 --> 00:00:25.920
This is the first of four lessons in Curve-Based and Empirical Fixed-Income Risk Measures,

6
00:00:26.361 --> 00:00:31.527
the thirteenth module of Fixed Income. The lesson before it was Portfolio duration and

7
00:00:31.608 --> 00:00:37.263
convexity, the last lesson of Yield-Based Bond Convexity and Portfolio Properties.

8
00:00:37.959 --> 00:00:43.021
These are the risk measures you reach for when a bond has an option built into it, like

9
00:00:43.044 --> 00:00:44.739
a call or a put.

10
00:00:45.189 --> 00:00:49.647
The exam loves them because the familiar tools quietly stop working here.

11
00:00:50.344 --> 00:00:55.452
Once you see why, the formulas are short, and you already know their shape.

12
00:00:56.352 --> 00:01:01.588
On the exam you will be asked which measure suits a callable bond or a mortgage-backed

13
00:01:01.611 --> 00:01:06.476
security, and how callable and putable bonds behave as rates move.

14
00:01:07.172 --> 00:01:12.234
You will also calculate effective duration and convexity from three model prices.

15
00:01:12.684 --> 00:01:18.152
The wrong options are predictable. One reaches for modified duration, one drops the 2

16
00:01:18.222 --> 00:01:22.808
from the formula, and one puts negative convexity on the putable bond.

17
00:01:23.708 --> 00:01:29.014
Start with why yield duration breaks. Modified duration assumes the promised cash flows

18
00:01:29.258 --> 00:01:34.993
arrive on schedule, so there is one yield to maturity that you can nudge up and down.

19
00:01:35.443 --> 00:01:41.236
An embedded option ruins that. A callable bond gets repaid early, and the issuer does

20
00:01:41.271 --> 00:01:46.252
that when rates fall. A putable bond gets repaid early when the investor demands it,

21
00:01:46.426 --> 00:01:48.493
and that happens when rates rise.

22
00:01:48.943 --> 00:01:52.287
So the timing of the cash flows depends on future interest rates.

23
00:01:52.890 --> 00:01:58.962
There is no single well-defined yield to maturity, and even yield to worst is only one

24
00:01:59.020 --> 00:02:00.878
of several possible outcomes.

25
00:02:01.328 --> 00:02:05.914
That is why Macaulay and modified duration are the wrong tools here.

26
00:02:06.518 --> 00:02:10.221
The fix is to shift the market instead of the bond's own yield.

27
00:02:10.732 --> 00:02:16.084
You move a benchmark yield curve, such as a government par curve, and let a model decide

28
00:02:16.131 --> 00:02:17.907
how the cash flows react.

29
00:02:18.357 --> 00:02:24.580
That measure is effective duration, and it is a curve duration, not a yield duration.

30
00:02:24.859 --> 00:02:30.153
Keep that label in your head: curve duration and yield duration are two different families.

31
00:02:30.603 --> 00:02:33.285
Think of the risk measures as three groups.

32
00:02:33.796 --> 00:02:40.588
Yield-based measures shift the bond's own yield: Macaulay and modified duration for option-free

33
00:02:40.622 --> 00:02:47.170
bonds, and approximate duration and convexity from three prices, with the yield bumped

34
00:02:47.217 --> 00:02:48.204
up and down.

35
00:02:48.654 --> 00:02:54.041
Curve-based measures shift the benchmark curve: effective duration and convexity for

36
00:02:54.099 --> 00:03:00.519
embedded options, and key rate duration, one maturity at a time, for changes in shape.

37
00:03:01.471 --> 00:03:04.769
Empirical measures are estimated from historical prices.

38
00:03:05.582 --> 00:03:10.667
Key rate duration and empirical duration get their own lessons later in this module.

39
00:03:11.117 --> 00:03:16.562
One more point. Effective duration also works for option-free bonds, and it comes out

40
00:03:16.620 --> 00:03:19.836
close to modified duration, but not identical.

41
00:03:20.440 --> 00:03:24.910
A parallel shift in the par curve is not a parallel shift in spot rates.

42
00:03:25.360 --> 00:03:28.471
The two match exactly only when the curve is flat.

43
00:03:28.913 --> 00:03:33.661
The gap shrinks as the curve gets flatter, the maturity gets shorter, or the price gets

44
00:03:33.708 --> 00:03:34.787
closer to par.

45
00:03:35.687 --> 00:03:41.469
Now the calculation. It is the same approximation you already know, with two changes.

46
00:03:41.910 --> 00:03:47.251
The yield change becomes a curve change, and the prices come from an option pricing model.

47
00:03:47.701 --> 00:03:53.819
You lower the curve and get a price, which I'll call P V minus, where P V stands for

48
00:03:53.889 --> 00:03:58.556
present value. You raise it by the same amount and get P V plus.

49
00:03:59.253 --> 00:04:01.865
Today's full price is P V zero.

50
00:04:02.315 --> 00:04:08.364
Effective duration looks at how far apart the price is when the curve falls and when

51
00:04:08.399 --> 00:04:13.089
it rises, scaled by the size of the curve shift and by today's price.

52
00:04:13.786 --> 00:04:19.242
In plain words, the more the price moves for a given shift, the larger the effective

53
00:04:19.266 --> 00:04:20.101
duration.

54
00:04:20.551 --> 00:04:24.742
Effective convexity compares the two shifted prices with today's price.

55
00:04:25.253 --> 00:04:30.698
Add the two shifted prices, take away twice today's price, and what is left is the bend

56
00:04:30.756 --> 00:04:35.946
in the price line. That bend is then scaled by the curve shift squared and by today's

57
00:04:35.992 --> 00:04:36.666
price.

58
00:04:37.116 --> 00:04:40.820
Duration has a 2 and a single curve shift in the denominator.

59
00:04:41.330 --> 00:04:45.011
Convexity has no 2, and the curve shift is squared.

60
00:04:45.452 --> 00:04:50.073
The shift goes in as a decimal, not as a number of basis points.

61
00:04:50.523 --> 00:04:56.676
Here is the worked example, a callable bond priced at about 101, with the curve shifted

62
00:04:56.734 --> 00:04:59.521
25 basis points down and then up.

63
00:05:00.333 --> 00:05:04.954
The model gives a slightly higher price when the curve falls, and a slightly lower one

64
00:05:04.989 --> 00:05:06.080
when it rises.

65
00:05:06.530 --> 00:05:12.486
Duration first. The gap between the two shifted prices is small next to today's price,

66
00:05:12.927 --> 00:05:19.185
but the shift behind it is tiny too. Put those together as the formula says, and effective

67
00:05:19.208 --> 00:05:21.855
duration comes out at about 4.7.

68
00:05:22.305 --> 00:05:27.448
Convexity next. The two shifted prices add up to just a little less than twice today's

69
00:05:27.483 --> 00:05:30.618
price, short by only 0.10.

70
00:05:31.129 --> 00:05:36.852
Divide that by the tiny curve shift squared and the small shortfall becomes a large negative

71
00:05:36.887 --> 00:05:39.685
number, about minus 158.

72
00:05:40.498 --> 00:05:43.249
So effective convexity is negative.

73
00:05:43.699 --> 00:05:50.212
Look at that sign. A fall in the curve lifts the price by about 1.15, but an

74
00:05:50.282 --> 00:05:53.184
equal rise cuts it by about 1.25.

75
00:05:53.695 --> 00:05:59.291
The bond gains less when rates fall than it loses when rates rise, and that is negative

76
00:05:59.326 --> 00:06:00.278
convexity.

77
00:06:00.728 --> 00:06:06.417
Here is the same check in words. Scale the price gap by the shift and by today's price,

78
00:06:06.858 --> 00:06:09.668
and duration comes out at about 4.7.

79
00:06:10.271 --> 00:06:16.053
For convexity, the two shifted prices add up to a hair less than twice today's price,

80
00:06:16.564 --> 00:06:20.941
and dividing that small shortfall by the squared shift and the price gives about minus

81
00:06:21.034 --> 00:06:22.091
158.

82
00:06:22.541 --> 00:06:28.613
The lesson page has two solvers for this, one for effective duration and one for effective

83
00:06:28.648 --> 00:06:34.813
convexity. In the duration solver you can pick what the question asks for, like today's

84
00:06:34.859 --> 00:06:40.142
full price, and change the curve shift box, which is typed in basis points.

85
00:06:40.592 --> 00:06:46.153
In the convexity solver, try nudging the box for the price with the curve down, and watch

86
00:06:46.211 --> 00:06:52.190
the sign of the answer flip. If you want a go, use the lesson page after the episode.

87
00:06:52.701 --> 00:06:54.756
For now, I'll keep going.

88
00:06:55.206 --> 00:06:58.050
That flip is the point of a tip worth remembering.

89
00:06:58.561 --> 00:07:04.355
The convexity top is a difference of big, nearly equal numbers, so keep every decimal

90
00:07:04.413 --> 00:07:07.280
of every price, or the sign can go wrong.

91
00:07:07.730 --> 00:07:10.412
The lesson page has a few extra boxes here.

92
00:07:11.016 --> 00:07:16.205
The first lists the five inputs to the option model: the length of call protection, the

93
00:07:16.252 --> 00:07:21.511
schedule of call prices and dates, the credit spread over the benchmark, the volatility

94
00:07:21.569 --> 00:07:24.309
assumption, and the level of market rates.

95
00:07:24.759 --> 00:07:30.204
You hold the first four constant and move only the last one, up and down in parallel.

96
00:07:30.715 --> 00:07:32.886
That is what makes it a curve duration.

97
00:07:33.336 --> 00:07:37.562
Another box says a smaller shift is not always more accurate here.

98
00:07:38.166 --> 00:07:44.818
With a plain bond a tiny bump is best, but for complex securities the model also predicts

99
00:07:44.888 --> 00:07:50.705
what issuers and borrowers will do, and that behavior changes with the size of the move.

100
00:07:51.155 --> 00:07:55.068
A last box notes that these measures apply to liabilities too.

101
00:07:55.671 --> 00:08:00.884
A pension obligation whose payments depend on rates or inflation has an effective duration,

102
00:08:01.058 --> 00:08:03.462
found by the same repricing.

103
00:08:04.362 --> 00:08:07.195
Now how callable and putable bonds behave.

104
00:08:08.008 --> 00:08:13.395
A callable bond is worth less than its straight twin, by the value of the call, because

105
00:08:13.429 --> 00:08:20.523
the issuer owns that option. A putable bond is worth more, by the value of the put, because

106
00:08:20.558 --> 00:08:22.288
the investor owns it.

107
00:08:22.738 --> 00:08:25.838
Each option matters most where it is likely to be used.

108
00:08:26.221 --> 00:08:30.575
The call bites when rates fall, and the price gets capped near the call price.

109
00:08:31.178 --> 00:08:35.788
The put bites when rates rise, and the price gets floored near the put price.

110
00:08:36.238 --> 00:08:41.288
Both options shorten effective duration compared with the straight bond, the callable

111
00:08:41.335 --> 00:08:46.130
especially when rates are low, the putable especially when rates are high.

112
00:08:46.826 --> 00:08:52.167
Read it as a shorter expected life: the call may end the bond early, and the put lets

113
00:08:52.213 --> 00:08:53.932
the investor leave early.

114
00:08:54.382 --> 00:09:00.036
Now convexity. When rates are high compared with the coupon, the call is far out of the

115
00:09:00.082 --> 00:09:05.586
money, so the callable and the straight bond behave almost the same, and both have positive

116
00:09:05.620 --> 00:09:06.549
convexity.

117
00:09:06.999 --> 00:09:12.641
As rates fall, the call gains value and the callable's price curve flattens against the

118
00:09:12.676 --> 00:09:18.539
call price. The slope drops, and past some point the curve bends the wrong way.

119
00:09:18.980 --> 00:09:24.936
That is negative convexity, and the investor bears the call risk, because a called bond

120
00:09:24.994 --> 00:09:27.107
has to be replaced at a lower rate.

121
00:09:27.557 --> 00:09:31.899
The put works the mirror way when rates rise, but it never bends the curve downward.

122
00:09:32.503 --> 00:09:35.220
So the putable bond keeps positive convexity.

123
00:09:35.730 --> 00:09:38.517
Only the callable can go negatively convex.

124
00:09:38.967 --> 00:09:44.261
Mortgage-backed securities behave like callable bonds, because borrowers refinance when

125
00:09:44.319 --> 00:09:45.190
rates fall.

126
00:09:45.640 --> 00:09:50.296
The lesson page has an interactive that compares the straight bond with either Callable

127
00:09:50.330 --> 00:09:52.931
at 102 or Putable at 100.

128
00:09:53.535 --> 00:09:58.365
A slider moves the benchmark curve shift, you can also drag the marker on the chart,

129
00:09:58.690 --> 00:10:01.476
and a button takes you back to today's curve.

130
00:10:01.926 --> 00:10:06.733
On the lesson page, with the callable showing, drag the marker well to the left and the

131
00:10:06.779 --> 00:10:11.377
price flattens against the call price while the convexity badge stays negative.

132
00:10:12.189 --> 00:10:17.959
Switch to the putable, drag right, and the price floors out while the badge stays positive.

133
00:10:18.563 --> 00:10:21.373
If you want a go, use the lesson page after the episode.

134
00:10:21.814 --> 00:10:23.474
For now, I'll keep going.

135
00:10:23.924 --> 00:10:29.775
The tip sums it up. The call caps your upside when rates fall, the put caps your downside

136
00:10:29.799 --> 00:10:35.429
when rates rise, duration shortens either way, and only the callable can go negatively

137
00:10:35.476 --> 00:10:36.323
convex.

138
00:10:37.223 --> 00:10:42.900
First trap: choosing modified or Macaulay duration for a callable bond or a mortgage-backed

139
00:10:42.923 --> 00:10:45.571
security, just because they are familiar.

140
00:10:46.081 --> 00:10:50.040
With embedded options the answer is effective duration.

141
00:10:50.490 --> 00:10:54.124
Second trap: saying a putable bond can have negative convexity.

142
00:10:54.565 --> 00:10:57.456
It can't. Only the callable can.

143
00:10:57.906 --> 00:11:01.308
Third trap: thinking embedded options lengthen duration.

144
00:11:01.586 --> 00:11:03.432
Calls and puts both shorten it.

145
00:11:03.882 --> 00:11:10.000
Fourth trap: leaving the 2 out of the effective duration denominator, or adding one to

146
00:11:10.070 --> 00:11:15.492
the convexity denominator. Duration has the 2, convexity does not.

147
00:11:15.942 --> 00:11:21.840
Fifth trap: dividing by 100 instead of by today's price, or entering the curve shift

148
00:11:21.886 --> 00:11:24.673
in basis points instead of as a decimal.

149
00:11:25.573 --> 00:11:31.668
Takeaways. Embedded options make the cash flows uncertain, so you use effective duration

150
00:11:31.993 --> 00:11:34.815
and convexity, the curve-based measures.

151
00:11:35.265 --> 00:11:41.024
They use the same approximation formulas as before, with the curve shift and model prices.

152
00:11:41.534 --> 00:11:46.898
Calls and puts both shorten effective duration, and only the callable can show negative

153
00:11:46.921 --> 00:11:47.897
convexity.

154
00:11:48.797 --> 00:11:54.579
That is effective duration and effective convexity, the first lesson of Curve-Based and

155
00:11:54.625 --> 00:12:00.326
Empirical Fixed-Income Risk Measures. Next in this module is Price change with effective

156
00:12:00.349 --> 00:12:06.270
duration and convexity. Now three quick questions, and none of them needs a calculator.

157
00:12:06.595 --> 00:12:09.092
Each one pauses for a moment before the answer.

158
00:12:09.992 --> 00:12:15.391
Question one. Why is modified duration the wrong tool for a callable bond?

159
00:12:16.076 --> 00:12:18.723
A: The bond's coupon is too low.

160
00:12:19.315 --> 00:12:25.294
B: The call makes the timing of the cash flows depend on future rates, so there is no

161
00:12:25.410 --> 00:12:31.946
single yield to maturity. C: Modified duration cannot be calculated for any

162
00:12:32.016 --> 00:12:33.676
bond that pays a coupon.

163
00:12:37.676 --> 00:12:43.690
The answer is B. The issuer may repay early when rates fall, so the cash flows are not

164
00:12:43.748 --> 00:12:49.402
fixed. Effective duration solves this by shifting the benchmark curve and letting a model

165
00:12:49.472 --> 00:12:51.794
decide how the cash flows react.

166
00:12:52.694 --> 00:12:56.978
Question two. Which bond can show negative effective convexity?

167
00:12:57.419 --> 00:13:00.775
A: A putable bond when rates rise sharply.

168
00:13:01.100 --> 00:13:04.072
B: An option-free bond when rates fall.

169
00:13:04.455 --> 00:13:07.323
C: A callable bond when rates fall.

170
00:13:11.323 --> 00:13:17.082
The answer is C. As rates fall the call gains value and the price flattens against the

171
00:13:17.116 --> 00:13:20.576
call price, so the price curve can bend the wrong way.

172
00:13:21.180 --> 00:13:26.555
A put never bends the curve downward, so the putable bond keeps positive convexity.

173
00:13:27.455 --> 00:13:33.167
Question three. Compared with an otherwise identical straight bond, what does an embedded

174
00:13:33.214 --> 00:13:37.242
option, whether a call or a put, do to effective duration?

175
00:13:38.183 --> 00:13:41.851
A: It shortens it, whichever option it is.

176
00:13:42.281 --> 00:13:45.938
B: It lengthens it, whichever option it is.

177
00:13:46.635 --> 00:13:51.139
C: It lengthens it for a call and shortens it for a put.

178
00:13:55.139 --> 00:14:01.931
The answer is A. Read it as a shorter expected life: the call may end the bond early,

179
00:14:02.175 --> 00:14:04.706
and the put lets the investor leave early.

180
00:14:05.606 --> 00:14:08.857
That was Effective duration and effective convexity.

181
00:14:09.368 --> 00:14:13.954
The lesson, its solver and the quiz are at analystdojo dot com.

182
00:14:14.464 --> 00:14:18.423
Next: Price change with effective duration and convexity.
