WEBVTT

1
00:00:00.000 --> 00:00:04.342
This is Analyst Dojo: lessons for the CFA Level One exam.

2
00:00:04.946 --> 00:00:11.552
Today: Price change with effective duration and convexity, from Fixed Income ·

3
00:00:11.726 --> 00:00:14.861
Curve-Based and Empirical Fixed-Income Risk Measures.

4
00:00:15.761 --> 00:00:19.151
Price change with effective duration and convexity.

5
00:00:19.964 --> 00:00:25.084
This is the second lesson of Curve-Based and Empirical Fixed-Income Risk Measures, the

6
00:00:25.153 --> 00:00:31.319
thirteenth module of Fixed Income. The lesson before it was Effective duration and effective

7
00:00:31.354 --> 00:00:37.809
convexity. Now you turn those two measures into an actual estimate of how much a bond's

8
00:00:37.855 --> 00:00:38.889
price moves.

9
00:00:39.339 --> 00:00:44.111
It is the same two-term formula you met in the convexity module, with the curve shift

10
00:00:44.157 --> 00:00:50.113
in place of the yield change. The new twist is what negative convexity does to the answer.

11
00:00:51.013 --> 00:00:55.680
On the exam you will calculate the percentage price change for a shift in the benchmark

12
00:00:55.727 --> 00:00:59.686
curve, given effective duration and effective convexity.

13
00:01:00.382 --> 00:01:06.570
Expect a callable bond with negative convexity and a move of 100 to 200 basis points.

14
00:01:07.020 --> 00:01:12.256
The wrong options treat the convexity as positive, ignore it altogether, or use basis

15
00:01:12.314 --> 00:01:13.847
points instead of decimals.

16
00:01:14.747 --> 00:01:17.313
The formula uses three substitutions.

17
00:01:17.696 --> 00:01:23.222
Effective duration replaces modified duration, effective convexity replaces convexity,

18
00:01:23.605 --> 00:01:26.914
and the benchmark curve shift replaces the yield change.

19
00:01:27.364 --> 00:01:32.983
And the shift is a parallel shift: every maturity on the curve moves by the same amount.

20
00:01:33.433 --> 00:01:38.936
Here it is: the percentage change in the full price is about minus effective duration

21
00:01:38.994 --> 00:01:44.637
times the curve shift, plus one half times effective convexity times the curve shift

22
00:01:44.706 --> 00:01:50.616
squared. In plain words, a straight-line estimate from duration, then a correction for

23
00:01:50.662 --> 00:01:51.452
the bend.

24
00:01:51.902 --> 00:01:59.309
Work it in three steps, with the shift as a decimal, so 100 basis points is 0.0100.

25
00:02:00.006 --> 00:02:04.371
Step one, the duration term is minus effective duration times the shift.

26
00:02:04.882 --> 00:02:07.552
Its sign is opposite to the shift.

27
00:02:08.002 --> 00:02:14.608
Step two, the convexity term is one half times effective convexity times the shift

28
00:02:14.655 --> 00:02:20.587
squared. Because the shift is squared, this term takes the sign of the effective convexity,

29
00:02:20.912 --> 00:02:25.278
whichever way rates move. Step three, add the two.

30
00:02:25.728 --> 00:02:27.864
Here is what sets the sign of each term.

31
00:02:28.375 --> 00:02:33.495
The duration term goes against the shift, so a curve rise means a price fall.

32
00:02:34.099 --> 00:02:39.079
The convexity term follows the sign of the effective convexity, whichever way the curve

33
00:02:39.126 --> 00:02:39.846
moves.

34
00:02:40.296 --> 00:02:45.671
A callable bond at low rates has negative convexity, so that term hurts you both ways.

35
00:02:46.113 --> 00:02:51.709
A putable or an option-free bond has positive convexity, so that term helps you both

36
00:02:51.767 --> 00:02:52.417
ways.

37
00:02:52.867 --> 00:02:57.662
Take the callable bond from the previous lesson, with an effective duration of about

38
00:02:57.708 --> 00:03:01.540
4.7 and a large negative effective convexity.

39
00:03:02.143 --> 00:03:05.406
First the curve goes up 100 basis points.

40
00:03:05.856 --> 00:03:09.641
The duration term alone is a loss of about 4.7 percent.

41
00:03:10.245 --> 00:03:15.806
The convexity term is negative for this bond, so it adds a further loss of about 0.8

42
00:03:15.841 --> 00:03:21.088
percent. Together, the price falls by about 5.5 percent.

43
00:03:21.538 --> 00:03:24.440
Now the curve goes down 100 basis points.

44
00:03:24.951 --> 00:03:29.096
The duration term flips and becomes a gain of about 4.7 percent.

45
00:03:29.700 --> 00:03:35.818
But the convexity term does not flip. It is still a loss of about 0.8 percent, so the

46
00:03:35.888 --> 00:03:38.999
total is a gain of just under 4 percent.

47
00:03:39.449 --> 00:03:46.067
Look at the asymmetry. The bond loses about 5.5 percent when the curve rises, but gains

48
00:03:46.136 --> 00:03:49.108
only about 4 percent when it falls by the same amount.

49
00:03:49.805 --> 00:03:53.845
That lopsidedness is what negative convexity means.

50
00:03:54.295 --> 00:03:59.438
Now an option-free bond with the same duration and a positive effective convexity.

51
00:04:00.135 --> 00:04:03.026
Here the convexity term is a small gain both ways.

52
00:04:03.537 --> 00:04:09.307
Up 100 basis points gives a loss of about 4.6 percent, a little smaller than duration

53
00:04:09.365 --> 00:04:14.403
alone. Down gives a gain of about 4.9 percent, a little larger.

54
00:04:14.853 --> 00:04:18.998
Here the gain is bigger than the loss, so the asymmetry runs the other way.

55
00:04:19.509 --> 00:04:24.187
Same duration, opposite shape, and the sign of the convexity makes all the difference.

56
00:04:24.637 --> 00:04:30.140
Here is the same calculation in words. Multiply the effective duration by the shift and

57
00:04:30.349 --> 00:04:35.783
flip the sign, and you get the duration term, a loss of about 4.7 percent.

58
00:04:36.224 --> 00:04:41.681
Then take half the effective convexity times the shift squared, keeping its minus sign,

59
00:04:42.064 --> 00:04:45.396
and you get a further loss of about 0.8 percent.

60
00:04:45.907 --> 00:04:50.318
Add them, and the price falls by about 5.5 percent.

61
00:04:50.768 --> 00:04:55.702
For the fall, the duration term flips to a gain of about 4.7 percent.

62
00:04:56.515 --> 00:05:02.424
The convexity term does not change, because the shift is squared, so it stays a loss

63
00:05:02.471 --> 00:05:08.415
of about 0.8 percent. The net result is a gain of just under 4 percent.

64
00:05:08.865 --> 00:05:11.605
The lesson page has a solver for this price change.

65
00:05:12.116 --> 00:05:16.980
You can pick what the question asks for, such as the effective convexity, and the shift

66
00:05:17.015 --> 00:05:18.710
box takes basis points.

67
00:05:19.160 --> 00:05:25.650
For instance, type minus 100 in the shift box to see the down move, or change the convexity

68
00:05:25.929 --> 00:05:29.342
to plus 30 to see the option-free contrast.

69
00:05:30.155 --> 00:05:33.603
If you want a go, use the lesson page after the episode.

70
00:05:33.881 --> 00:05:36.018
For now, I'll keep going.

71
00:05:36.468 --> 00:05:41.797
The lesson page has an interactive that shows the up move and the down move at once.

72
00:05:42.401 --> 00:05:48.032
It has a box for effective duration, a slider for effective convexity, and a slider for

73
00:05:48.078 --> 00:05:49.703
the benchmark curve shift.

74
00:05:50.153 --> 00:05:56.446
On the lesson page, you can slide the convexity from negative up to plus 30 and watch

75
00:05:56.504 --> 00:05:59.615
which bar is bigger, the loss or the gain.

76
00:06:00.428 --> 00:06:06.569
Or you can push the shift out to 200 basis points and see the convexity term grow faster

77
00:06:06.639 --> 00:06:12.676
than the duration term. If you want a go, use the lesson page after the episode.

78
00:06:13.126 --> 00:06:15.936
Here is a tip: check the sign last.

79
00:06:16.539 --> 00:06:21.404
The duration term goes opposite to the shift, and the convexity term takes the sign of

80
00:06:21.450 --> 00:06:23.854
the convexity and never flips.

81
00:06:24.754 --> 00:06:29.630
Now how to read the result. The two signs tell you who wins and who loses.

82
00:06:30.080 --> 00:06:33.772
With a callable bond, the upside is limited when rates fall.

83
00:06:34.283 --> 00:06:39.600
The call is the issuer's refinancing option: buy the bond back at the call price, then

84
00:06:39.658 --> 00:06:45.243
borrow again more cheaply. The investor gets a smaller gain and has to reinvest at lower

85
00:06:45.312 --> 00:06:45.962
rates.

86
00:06:46.412 --> 00:06:51.718
A putable bond is the mirror image. The downside is limited when rates rise, because

87
00:06:51.753 --> 00:06:57.627
the investor can sell it back at the put price, usually par, and reinvest at the higher

88
00:06:57.697 --> 00:07:04.396
rate. Effective duration and convexity both fall as rates rise, but the convexity

89
00:07:04.454 --> 00:07:05.731
stays positive.

90
00:07:06.181 --> 00:07:11.185
Now a putable bond with an effective duration a little over 4, moved up and down by the

91
00:07:11.231 --> 00:07:16.607
same amount. The duration term goes against the shift, and the positive convexity term

92
00:07:16.723 --> 00:07:22.806
adds in both directions. So when the curve rises, the loss is trimmed to about 5 percent.

93
00:07:23.256 --> 00:07:27.273
When the curve falls, the gain is about 5.7 percent.

94
00:07:27.784 --> 00:07:32.672
So the gain from a fall in rates comes out bigger than the loss from an equal rise.

95
00:07:33.275 --> 00:07:35.655
That is the shape an investor would like.

96
00:07:36.105 --> 00:07:38.973
One point explains why the estimate is only local.

97
00:07:39.414 --> 00:07:44.917
A callable's effective duration is not constant: it shortens as rates fall and the call

98
00:07:44.998 --> 00:07:50.617
moves into the money. So the estimate is accurate near today's rates, and a very large

99
00:07:50.664 --> 00:07:52.452
fall can change the inputs.

100
00:07:52.902 --> 00:07:56.385
A second point makes a sharp case about negative convexity.

101
00:07:56.896 --> 00:08:02.550
If up and down moves are equally likely, the average of the loss and the gain is a small

102
00:08:02.620 --> 00:08:07.902
loss of about 0.8 percent, which is exactly the convexity term.

103
00:08:08.352 --> 00:08:12.253
So a symmetric shock gives a negative expected price change.

104
00:08:12.764 --> 00:08:15.190
The bond must therefore offer extra yield.

105
00:08:15.701 --> 00:08:20.705
A manager expecting falling rates may still accept it, but only if the extra yield is

106
00:08:20.763 --> 00:08:22.238
worth the capped upside.

107
00:08:23.138 --> 00:08:28.792
First trap: plugging in the size of the effective convexity and adding it as positive.

108
00:08:29.233 --> 00:08:30.708
Keep the negative sign.

109
00:08:31.158 --> 00:08:37.149
Second trap: entering the curve shift in basis points, 100, instead of as a decimal,

110
00:08:37.427 --> 00:08:39.192
0.01.

111
00:08:39.642 --> 00:08:43.647
Third trap: expecting the up and down moves to give mirror-image answers.

112
00:08:43.856 --> 00:08:44.704
They don't.

113
00:08:45.154 --> 00:08:48.776
Fourth trap: forgetting the one half in the convexity term.

114
00:08:49.226 --> 00:08:53.289
Fifth trap: flipping the sign of the convexity term when the curve falls.

115
00:08:53.673 --> 00:08:55.588
Only the duration term flips.

116
00:08:56.488 --> 00:09:03.187
Takeaways. The formula is minus effective duration times the shift, plus one half times

117
00:09:03.245 --> 00:09:06.252
effective convexity times the shift squared.

118
00:09:06.949 --> 00:09:11.674
Keep the sign of the convexity: negative convexity hurts you both ways.

119
00:09:12.124 --> 00:09:16.338
Callables have capped upside, and putables have a cushioned downside.

120
00:09:16.849 --> 00:09:21.551
And the estimate is local, because effective duration changes with the level of rates.

121
00:09:22.451 --> 00:09:27.943
That is price change with effective duration and convexity, the second lesson of Curve-Based

122
00:09:28.001 --> 00:09:30.613
and Empirical Fixed-Income Risk Measures.

123
00:09:31.309 --> 00:09:33.980
Next in this module is Key rate duration.

124
00:09:34.421 --> 00:09:38.101
Now three quick questions, and none of them needs a calculator.

125
00:09:38.798 --> 00:09:41.445
Each one pauses for a moment before the answer.

126
00:09:42.345 --> 00:09:46.757
Question one. A callable bond has negative effective convexity.

127
00:09:47.198 --> 00:09:50.542
The curve rises, then falls by the same amount.

128
00:09:51.145 --> 00:09:57.670
How does the convexity term behave? A: It is negative on the rise and positive on the

129
00:09:57.717 --> 00:10:01.385
fall. B: It is negative both times.

130
00:10:01.989 --> 00:10:04.822
C: It is positive both times.

131
00:10:08.822 --> 00:10:15.161
The answer is B. The shift is squared, so the convexity term keeps the sign of the effective

132
00:10:15.196 --> 00:10:18.029
convexity whichever way the curve moves.

133
00:10:18.540 --> 00:10:21.964
Only the duration term flips with the direction of the shift.

134
00:10:22.864 --> 00:10:29.342
Question two. Relative to a duration-only estimate, negative effective convexity makes

135
00:10:29.389 --> 00:10:32.791
a callable bond's estimated price rise when rates fall...

136
00:10:33.394 --> 00:10:36.123
A: Larger. B: The same.

137
00:10:36.726 --> 00:10:38.096
C: Smaller.

138
00:10:42.096 --> 00:10:48.005
The answer is C. The convexity term is negative whichever way rates move, so it is subtracted

139
00:10:48.064 --> 00:10:49.480
from the duration gain.

140
00:10:50.380 --> 00:10:55.941
Question three. An option-free bond with positive convexity and a callable bond with

141
00:10:56.057 --> 00:10:59.308
negative convexity have the same effective duration.

142
00:10:59.749 --> 00:11:02.466
The curve rises by the same amount for both.

143
00:11:03.070 --> 00:11:06.947
Which loses more? A: The callable bond.

144
00:11:07.226 --> 00:11:12.207
B: They lose the same. C: The option-free bond.

145
00:11:16.207 --> 00:11:21.768
The answer is A. The duration terms match, but the callable bond's negative convexity

146
00:11:21.826 --> 00:11:27.295
term adds to its loss, while the positive convexity term cushions the option-free bond's

147
00:11:27.341 --> 00:11:28.003
loss.

148
00:11:28.903 --> 00:11:32.560
That was Price change with effective duration and convexity.

149
00:11:33.001 --> 00:11:37.564
The lesson, its solver and the quiz are at analystdojo dot com.

150
00:11:38.168 --> 00:11:40.234
Next: Key rate duration.
