WEBVTT

1
00:00:00.000 --> 00:00:04.203
This is Analyst Dojo: lessons for the CFA Level One exam.

2
00:00:04.447 --> 00:00:09.056
Today: Real options, from Corporate Issuers · Capital allocation.

3
00:00:09.956 --> 00:00:16.400
Real options. This is the last of five lessons in Capital Allocation, the fifth module

4
00:00:16.446 --> 00:00:22.483
of Corporate Issuers. The lesson before it was Capital allocation principles and pitfalls.

5
00:00:23.180 --> 00:00:27.858
Until now we have treated an investment as one decision made on day one.

6
00:00:28.369 --> 00:00:33.907
In practice a company can wait, expand, shrink or walk away, and that flexibility has

7
00:00:33.977 --> 00:00:34.708
value.

8
00:00:35.608 --> 00:00:39.230
On the exam you will describe the types of real option.

9
00:00:39.834 --> 00:00:46.011
Expect a scenario where you name the option, the project net present value, or N P V,

10
00:00:46.092 --> 00:00:51.444
equation, and a small decision tree that you read to value an abandonment option.

11
00:00:52.344 --> 00:00:57.836
The N P V work in the earlier lessons assumes everything is decided on day one.

12
00:00:58.346 --> 00:01:03.908
In reality an investment is a series of decisions, and some of them are postponed until

13
00:01:03.954 --> 00:01:05.347
the company learns more.

14
00:01:05.797 --> 00:01:10.917
A real option is the right, not the obligation, to take such an action later.

15
00:01:11.521 --> 00:01:16.780
It sits on a real investment rather than a financial asset, and the company exercises

16
00:01:16.850 --> 00:01:19.265
it only if doing so adds value.

17
00:01:19.715 --> 00:01:25.334
Like a financial option on an underlying asset, a real option depends on future events.

18
00:01:25.938 --> 00:01:29.851
That could be demand, a commodity price, or a regulatory decision.

19
00:01:30.361 --> 00:01:34.111
And that flexibility can add a great deal to N P V.

20
00:01:35.011 --> 00:01:41.002
What types of real option are there? A handy mnemonic is T, S, F, F: timing, sizing,

21
00:01:41.048 --> 00:01:42.952
flexibility and fundamental.

22
00:01:43.402 --> 00:01:47.512
Timing options let you delay or stage an investment to learn more first.

23
00:01:48.023 --> 00:01:52.458
An example is waiting a year for a subsidy decision before building.

24
00:01:52.969 --> 00:01:57.880
Waiting gives up near-term returns in exchange for better information, and investments

25
00:01:57.903 --> 00:02:01.792
can be sequenced so that one creates the option for the next.

26
00:02:02.242 --> 00:02:05.748
Sizing options change the scale after you have invested.

27
00:02:06.259 --> 00:02:12.621
Abandonment is the downside version: you stop and recover value, for instance by selling

28
00:02:12.691 --> 00:02:18.519
specialized equipment if demand flops. You walk away when the cash from abandoning exceeds

29
00:02:18.577 --> 00:02:20.539
the present value of continuing.

30
00:02:20.989 --> 00:02:27.142
The growth, or expansion, option is the mirror image: you invest more when results are

31
00:02:27.166 --> 00:02:33.342
strong. So abandonment and expansion are both sizing options, at opposite ends.

32
00:02:33.792 --> 00:02:37.171
Flexibility options concern how the project is run.

33
00:02:37.774 --> 00:02:43.208
With price-setting, when demand exceeds capacity you raise prices rather than output,

34
00:02:43.649 --> 00:02:46.191
as a ski resort does on busy weekends.

35
00:02:46.888 --> 00:02:52.089
With production flexibility, you change output when demand differs from plan, like a

36
00:02:52.147 --> 00:02:54.968
power plant switching between gas and oil.

37
00:02:55.418 --> 00:03:01.397
Fundamental options are the last type. Here the entire value depends on a factor outside

38
00:03:01.420 --> 00:03:07.806
the firm's control. A lithium deposit developed only if lithium prices are high is one,

39
00:03:08.131 --> 00:03:12.276
as is a gas field, and many research and development projects.

40
00:03:12.726 --> 00:03:18.264
The lesson page has an interactive with three tabs: Abandon, Expand and Wait.

41
00:03:18.868 --> 00:03:22.293
It uses the plant from the decision tree later in this lesson.

42
00:03:22.743 --> 00:03:28.734
On the lesson page, on the Abandon tab, tick the box that says to abandon and sell the

43
00:03:28.780 --> 00:03:32.577
plant if demand is weak, and watch the decision flip.

44
00:03:33.018 --> 00:03:37.395
Then drag the sale value down to 20, and the option becomes worthless.

45
00:03:38.347 --> 00:03:43.014
The sliders under The project let you change demand, cash flows, plant cost and required

46
00:03:43.061 --> 00:03:43.827
return.

47
00:03:44.277 --> 00:03:47.609
If you want to try it, use the lesson page after the episode.

48
00:03:47.818 --> 00:03:49.618
For now, I'll keep going.

49
00:03:50.518 --> 00:03:55.394
How do you value flexibility? There are three approaches.

50
00:03:55.719 --> 00:04:02.325
First, if N P V is already positive without the options, ignore them and invest, because

51
00:04:02.372 --> 00:04:05.890
options are a bonus and N P V is a minimum.

52
00:04:06.340 --> 00:04:09.440
Second, use the project N P V equation.

53
00:04:09.951 --> 00:04:15.303
Third, for complex projects, use decision trees or option pricing models.

54
00:04:16.000 --> 00:04:20.922
Decision trees probability-weight the branches, and option pricing models need inputs

55
00:04:20.969 --> 00:04:22.548
that are hard to observe.

56
00:04:22.998 --> 00:04:29.674
As a formula, project N P V equals the N P V without options, minus the cost

57
00:04:29.720 --> 00:04:32.739
of the option, plus the value of the option.

58
00:04:33.250 --> 00:04:38.869
In plain words, subtract what you pay for the flexibility, and add what the flexibility

59
00:04:38.915 --> 00:04:39.716
is worth.

60
00:04:40.166 --> 00:04:45.762
The worked example is Marlow Beverages, a fictional company, with a pilot bottling plant.

61
00:04:46.366 --> 00:04:50.615
On its own, the plant has an N P V of minus 6.0 million.

62
00:04:51.065 --> 00:04:56.359
But building the foundations oversized, leaving room for a second line, costs a bit more.

63
00:04:56.963 --> 00:05:00.214
And the right to expand is worth far more than that cost.

64
00:05:00.664 --> 00:05:07.026
So the project N P V is the negative base, minus the cost of the option, plus what the

65
00:05:07.096 --> 00:05:13.005
option is worth. The result is positive, so the flexibility turns a rejected project

66
00:05:13.180 --> 00:05:14.596
into an accepted one.

67
00:05:15.046 --> 00:05:21.582
On a calculator, start from the negative base N P V, subtract the cost, and add the option's

68
00:05:21.629 --> 00:05:22.291
value.

69
00:05:22.741 --> 00:05:28.012
Take the negative N P V, subtract the cost of the option, then add what the option is

70
00:05:28.058 --> 00:05:31.565
worth. The project N P V comes out positive.

71
00:05:32.015 --> 00:05:38.180
The lesson has a solver for this, called Project N P V with a real option, solve for

72
00:05:38.250 --> 00:05:45.181
any input. Under The question asks for, you can pick the project N P V, the option value,

73
00:05:45.332 --> 00:05:49.198
the option cost, or the N P V without options.

74
00:05:49.648 --> 00:05:55.383
In that solver, lower the option value until the project N P V turns negative again.

75
00:05:55.987 --> 00:06:01.966
Or choose the option value, to ask how much the flexibility must be worth to rescue the

76
00:06:02.001 --> 00:06:08.503
project. Same deal: if you want a go, use the lesson page after the episode.

77
00:06:08.953 --> 00:06:14.804
Now the decision tree. Each branch has an outcome and a probability, and the project

78
00:06:14.862 --> 00:06:17.695
is valued as a probability-weighted average.

79
00:06:18.299 --> 00:06:22.653
An abandonment option shows up as the better of two payoffs on the weak branch.

80
00:06:23.103 --> 00:06:27.016
The worked example builds a plant for 200 million pounds now.

81
00:06:27.712 --> 00:06:33.053
Next year there is a 60 percent chance of strong demand and a 40 percent chance of weak

82
00:06:33.099 --> 00:06:36.756
demand. The required return is 10 percent.

83
00:06:37.206 --> 00:06:42.628
Without the option, the expected cash flow is the probability-weighted average of the

84
00:06:42.674 --> 00:06:49.315
strong and weak outcomes. Brought back one year and net of the 200 outlay, the N

85
00:06:49.408 --> 00:06:53.088
P V is negative, so the project is rejected.

86
00:06:53.538 --> 00:06:58.205
With the option, if demand is weak you sell the plant instead of running it at a loss.

87
00:06:58.902 --> 00:07:02.780
That lifts the weak branch, so the expected cash flow rises.

88
00:07:03.230 --> 00:07:08.002
Brought back one year and net of the outlay, the N P V is now positive.

89
00:07:08.513 --> 00:07:12.472
The abandonment option turned a rejected project into an accepted one.

90
00:07:12.922 --> 00:07:16.196
The option's value is the gap between the two N P Vs.

91
00:07:16.800 --> 00:07:21.966
It equals the gain in the weak branch only, weighted by that branch's probability and

92
00:07:22.036 --> 00:07:23.464
discounted one year.

93
00:07:23.914 --> 00:07:29.417
Without the option, the expected cash flow is the probability-weighted average of the

94
00:07:29.475 --> 00:07:36.128
strong and weak outcomes. Brought back one year and net of the 200 outlay, the

95
00:07:36.209 --> 00:07:40.493
N P V is negative, about minus 12.7.

96
00:07:40.943 --> 00:07:45.947
With the option, the weak branch is lifted by the sale price, so the expected cash flow

97
00:07:46.028 --> 00:07:52.553
rises. Brought back one year and net of the outlay, the N P V is now positive, about

98
00:07:52.599 --> 00:07:53.250
20.

99
00:07:53.700 --> 00:07:57.369
A deeper point on why option pricing models are hard to use.

100
00:07:57.880 --> 00:08:03.476
They need inputs that are hard to observe, such as the volatility of project value, the

101
00:08:03.534 --> 00:08:06.285
timing of decisions, and the probabilities.

102
00:08:06.889 --> 00:08:11.022
So decision trees, which show their assumptions, are common.

103
00:08:11.472 --> 00:08:15.570
Sequential research and development stages are options on options.

104
00:08:15.953 --> 00:08:22.536
And a real option is not a hedge. It adds flexibility inside a project, whereas an airline

105
00:08:22.594 --> 00:08:28.841
locking in next year's jet fuel cost is using financial derivatives, not real options.

106
00:08:29.291 --> 00:08:33.622
One more tip. The cost of an option is subtracted, and its value is added.

107
00:08:34.318 --> 00:08:37.000
Forget the cost and you overstate the project.

108
00:08:37.900 --> 00:08:42.985
Now the traps. First, confusing real options with financial hedges.

109
00:08:43.496 --> 00:08:48.755
A real option adds flexibility to a project, while commodity price risk is hedged with

110
00:08:48.802 --> 00:08:50.207
financial derivatives.

111
00:08:50.657 --> 00:08:55.533
Second, forgetting to subtract the cost of the option in the project N P V equation.

112
00:08:55.983 --> 00:08:58.653
Third, treating an option as an obligation.

113
00:08:59.164 --> 00:09:02.067
The company exercises only when it adds value.

114
00:09:02.517 --> 00:09:06.592
Fourth, calling an expansion option an abandonment option, or the reverse.

115
00:09:07.196 --> 00:09:09.715
Both are sizing options, at opposite ends.

116
00:09:10.615 --> 00:09:16.792
The takeaways. A real option is the right, not the obligation, to take an action later.

117
00:09:17.395 --> 00:09:23.955
The types are timing, sizing, which covers abandon or expand, flexibility, which covers

118
00:09:24.013 --> 00:09:26.637
price or production, and fundamental.

119
00:09:27.087 --> 00:09:33.972
Project N P V equals N P V without options, minus the option cost, plus the option value.

120
00:09:34.668 --> 00:09:38.511
And flexibility can turn a rejected project into an accepted one.

121
00:09:39.411 --> 00:09:44.229
That is real options, the last of five lessons in Capital Allocation.

122
00:09:45.042 --> 00:09:47.910
Next in Corporate Issuers is the Capital Structure module.

123
00:09:48.606 --> 00:09:52.217
Now three quick questions, and none of them needs a calculator.

124
00:09:52.728 --> 00:09:55.526
Each one pauses for a moment before the answer.

125
00:09:56.426 --> 00:10:00.815
Question one. A company can stop and sell its plant if demand turns weak.

126
00:10:01.024 --> 00:10:04.588
This is... A: An abandonment option.

127
00:10:04.797 --> 00:10:08.129
B: A growth option. C: A timing option.

128
00:10:12.129 --> 00:10:18.155
The answer is A. Walking away and recovering value if results disappoint is an abandonment

129
00:10:18.213 --> 00:10:20.720
option, the downside end of sizing.

130
00:10:21.620 --> 00:10:26.194
Question two. In the project NPV equation, the cost of the option is...

131
00:10:26.705 --> 00:10:29.654
A: Added. B: Subtracted.

132
00:10:29.863 --> 00:10:31.233
C: Ignored.

133
00:10:35.233 --> 00:10:42.048
The answer is B. Project NPV equals NPV without options, minus the option cost, plus

134
00:10:42.094 --> 00:10:43.221
the option value.

135
00:10:44.121 --> 00:10:49.589
Question three. A mine will be developed only if the metal price rises above a set level.

136
00:10:50.193 --> 00:10:54.036
This is a... A: Production flexibility option.

137
00:10:54.419 --> 00:10:58.378
B: Timing option. C: Fundamental option.

138
00:11:02.378 --> 00:11:08.183
The answer is C. The entire value depends on an outside variable, the metal price, which

139
00:11:08.241 --> 00:11:09.855
is a fundamental option.

140
00:11:10.755 --> 00:11:17.686
That was Real options. The lesson, its solver and the quiz are at analystdojo dot com.

141
00:11:18.197 --> 00:11:25.662
Next: Weighted-average cost of capital (WACC), for subscribers on analystdojo.com.
